Bringing sustainability expertise and M&E engineering together at The Freight Building to improve energy performance and put occupant wellbeing at the heart of the workplace.
The Freight Building is a 9,742m² Grade A office development within Castleforbes, part of the wider regeneration of Dublin’s Docklands. The ambition was to create a high-performance workplace where environmental sustainability and occupant wellbeing were considered together, while giving future tenants a strong foundation for their own fitout and certification requirements.
Ethos brought M&E, public health and lift engineering together with sustainability consultancy, allowing these requirements to inform the engineering design rather than sit alongside it as a separate certification exercise. Our sustainability analysis informed the engineering approach, with heat recovery ventilation, four-pipe heat pump chillers, energy monitoring and intelligent controls supporting the building’s performance objectives.
That foundation became particularly valuable when XDanu developed its 903m² coworking fitout across the ground and first floors. Ethos established a LEED Roadmap to Gold and guided the project team through the design and construction requirements, while coordinating WELL requirements around the needs of a shared workplace. The base building strategy and documentation could then support the tenant’s certification pathway, reducing the complexity of pursuing certification at fitout stage.
Our energy modelling tested the fitout against ASHRAE 90.1-2010, giving the team evidence to understand how design decisions affected energy performance. The final model demonstrated 17.6% energy cost savings and a 17.6% reduction in greenhouse gas emissions against the ASHRAE baseline, contributing to the fitout achieving LEED v4 ID+C Gold with 64 points.
Ethos also used Life Cycle Assessment to examine the carbon impact of the fitout, including its MEP components. The assessment calculated upfront carbon of 104.97kgCO₂e/m² and showed that building systems and installations accounted for 51.4% of A1 to A3 carbon. This gave the project team a clearer understanding of where embodied carbon was concentrated, helping identify where future carbon reductions could be targeted.
The completed XDanu fitout also passed the WELL Coworking Rating with 25 points, becoming the first project in Ireland to achieve the rating. By carrying sustainability and wellbeing thinking from the base building into the tenant fitout, The Freight Building gave XDanu a stronger platform for certification and a workplace backed by measurable performance.