Helping atNorth create a resilient, scalable data centre campus in Sweden. A modular design approach supports phased delivery today, while building in the flexibility for future expansion.
SWE04 is a hyperscale data centre campus in Sollefteå, Sweden, designed for an initial 160MW deployment across two 80MW facilities. The wider masterplan also provides for a third 80MW data centre, creating a clear route for future growth.
At this scale, the challenge is not simply delivering capacity. The design needs to remain consistent as the campus grows, while supporting resilience, operational performance and efficient future deployment.
Ethos is leading the overall design management process, supported by multidisciplinary engineering across MEP, ICT, Security, Sustainability and Digital Management. From concept through detailed implementation, we are coordinating the design around atNorth’s technical standards, operational requirements and local regulations.
A modular 20MW IT block strategy sits at the heart of the design. Each block is engineered for near-identical replication, supporting phased delivery while reducing the need for significant redesign as the campus expands. This repeatable approach also supports greater consistency and cost efficiency across future phases.
Resilience is built into the infrastructure, with N+N incoming power, N+2 cooling plant and 5+1 diesel generator configurations. Hot aisle containment, water mist fire suppression and a comprehensive BMS provide further control across the critical environment.
BIM-led coordination through Revit and ACC keeps the multidisciplinary design aligned, while specialist studies including availability and reliability analysis and CFD modelling provide additional technical validation throughout the process.
SWE04 is also targeting LEED Gold certification readiness, with the design developed to support high-density, energy-efficient operation in line with atNorth’s wider sustainability objectives.
Now at Stage 2, SWE04 establishes a scalable engineering framework for 160MW of planned capacity — with the infrastructure and masterplan already prepared for the campus to grow further.