Confidential Data Centre

Data Centre

Client

Confidential

Architect

RKD Architects

Quantity Surveyor

Linesight

Project Manager

Linesight

Main Contractor

TBC

Civil Structural Engineers

Hanley Pepper

Project Size

19.2MW

Project Status

Achau: 23/06/2023 - IFP, 10/09/2025 - Construction, Vienna: Complete

Project Description

The data centres comprise of 2 units of 9.6MW COLO’s and associated electrical support rooms, including electrical rooms, battery rooms, prefabricated MV rooms, and an expansion of the existing 160MVA 110kV substation.

Ethos Input

As the mechanical and electrical deliverables provider, Ethos Engineering utilised BIM and Revit MEP to design the MEP services. The M&E services were developed to LOD 300 and transferred to the main contractor to complete throughout the project. Ethos Engineering provided full MEP design services and construction administration support.

Unique / Key Features

The cooling system utilises air side economisers (outside air) to cool the server and electrical spaces, achieving an all-air cooling system. Some areas (Battery Rooms) have additional DX Cooling provided. As this site was initially limited by available power in the region, the design team needed to design for ‘temporary’ infrastructure that would need to be replaced and upgraded as power became available from the utility.

Slider Image
Call to action background graphic
Call to action image

Want to know more about this project?

We’re excited to make a difference in your community! What can we tell you more about?

Get in touch

Related Projects

Sorry, there are no related projects for this category.