Helping EdgeConneX deliver 28MW of data centre capacity through coordinated MEP design, off-site prefabrication and efficient all-air cooling. Built for speed, resilience and long-term performance.
EDCAMS01 and EDCAMS02 form part of EdgeConneX’s data centre portfolio in Amsterdam. Together, the two facilities provide 28MW of capacity, combining four 2MW colocation units at EDCAMS01 with two 10MW colocation units at EDCAMS02. Each is supported by dedicated electrical and communications infrastructure.
For a programme of this scale, the design needed to support both reliable operation and efficient construction. Electrical support rooms were developed as fully prefabricated pods, manufactured off site and positioned externally to the buildings. This approach supported an accelerated construction programme while integrating the critical electrical infrastructure required by the facilities.
Ethos provided full MEP design services alongside construction administration support. We developed the building services design in BIM using Revit to LOD 300, giving the main contractor a coordinated model to take forward through construction.
Cooling performance was another key consideration. The design uses a highly efficient DX all-air cooling system with air-side economisers, drawing on outside air to cool the server spaces. The solution achieved an annualised PUE of 1.2, meeting stringent local authority requirements.
The project also required the extension and resilience of existing site MV supplies and connections to wider telecommunications infrastructure. Ethos worked closely with local Dutch partner Smits van Burgst to maintain on-the-ground support and local compliance, while managing the overall design process from Dublin.
The completed EDCAMS01 and EDCAMS02 facilities combine 28MW of data centre capacity with resilient infrastructure, efficient cooling and a design approach built around faster delivery — demonstrating how coordinated engineering can support performance from design through construction.